Manufacturing Facility

Fitchburg, WI

ARCHITECT

Eppstein Uhen Architects

SIZE

333,000 ft²

PROJECT OVERVIEW

The latest fully validated and commissioned greenfield addition to the Client’s campus houses designers and engineers working on next-generation innovative products for their line of products. The first floor serves as fabrication, assembly, and research and development. There are over 200 separate testing stations with multiple utilities, gas, and chemical lines at each. A partial second floor contains private offices for staff, collaboration spaces, and a breakroom with an outdoor patio overlooking Seminole Hwy. Large windows invite natural light into the building and a two-story glass atrium at the main entrance welcomes visitors.

Manufacturing facility reception

See what sets it apart

facility includes

  • Manufacturing space
  • 14 labs for new product design spaces
  • Product testing stations with separate utility, gas and chemical lines
  • Office space
  • Full-service breakroom

Keep browsing our projects.

Hooper operations exterior

Industrial

Hooper Fleet & Yard Operations

De Forest, WI

Sub Zero Living kitchen 4

Industrial

Sub-Zero Living Kitchen

Madison

Dancing Goat Rickhouse

Industrial

Dancing Goat Rickhouse

Cambridge

ACS Interior

Industrial

ACS

Verona

Plastic Ingenuity expansion final

Industrial

Plastic Ingenuity

Mazomanie


See All Work