Manufacturing Facility
Fitchburg, WI
ARCHITECT
Eppstein Uhen Architects
SIZE
333,000 ft²
PROJECT OVERVIEW
The latest fully validated and commissioned greenfield addition to the Client’s campus houses designers and engineers working on next-generation innovative products for their line of products. The first floor serves as fabrication, assembly, and research and development. There are over 200 separate testing stations with multiple utilities, gas, and chemical lines at each. A partial second floor contains private offices for staff, collaboration spaces, and a breakroom with an outdoor patio overlooking Seminole Hwy. Large windows invite natural light into the building and a two-story glass atrium at the main entrance welcomes visitors.
See what sets it apart
Facility Includes
- Manufacturing space
- 14 labs for new product design spaces
- Product testing stations with separate utility, gas and chemical lines
- Office space
- Full-service breakroom
Keep browsing our industrial projects.
Teel Plastics
Baraboo, WI
Sub-Zero Living Kitchen
Madison, WI
Plastic Ingenuity
Mazomanie, WI
High Track Cold Storage
McFarland, WI
Manufacturing Facility
Fitchburg, WI
Manufacturing Facility
Fitchburg, WI
Dancing Goat Rickhouse
Cambridge, WI
The Dancing Goat Rickhouse is a five-story, wood-framed Rickhouse designed to age 7,800 53-gallon barrels of spirits.
Hooper Fleet and Yard Operations
De Forest, WI
The Hooper Fleet and Yard Operations facility is the hub for all Hooper vehicles and equipment needing service.